Summer 2022 Boathouse Installation
Installation of Drilled steel piles to support Boathouse Foundation.
Installation of two Hidden Beam Wet Slip Lifts.
Decking completed in Veka Storm Grey PVC.
Canadian Canoe Museum 2024
Installation of Boardwalk and Docking System for the Canadian Canoe Museum in Peterborough, Ontario
Shoreline Boardwalk
Burleigh Island Lodge Installation of Shoreline Boardwalk to provide access to a rocky shoreline.
Steel House & Cottage Foundations
Drilling into Rock and laying the foundation for a new home or cottage build.
Camp Waldon
Design & Build Swimming platform with Dive Tower for Summer Camp
Indigo Bay – Cayman Islands Project
We manufactured our Aluminum Truss pipe Dock Frames and they attached them to pilings on the lake bottom.
Also, we manufactured Sunshades for their resort Windows. All manufactured in our Lakefield Ontario Facility and shipped down in containers for installation by locals.
Lakefield College School
Installed custom steel boardwalk along shoreline and covered with Veka PVC Decking.
Fabricated and installed custom floating dock systems for students to enjoy Sailing, Wind Surfing, Canoeing and Swimming.
Accessible Docking Systems
Making it easier for all municipal residents to enjoy the waterfront. This allows those with mobility issues to be able to safely board a kayak or canoe and enjoy time on the water.
One of these systems is currently installed in City of Kawartha Lakes and one in Campbellford.